Designation:

TAM

Info
Manufacturer: TAMSE Tanqu Argentino Mediano Sociedad Del Estado  
Product type: Armoured Vehicles  
Name: Main battle tank  

The TAM program started in 1973 when the EMGE (Lit: Estado Mayor General del Ejército or General High Command of Argentinian Army) ordered the development of a new medium tank to replace the obsolete M-4 Sherman & Sherman Firefly and a Infantry Combat Vehicle to replace the M-9 Haftracks. The new tank had to be equipped with 105 or 120mm gun, a last generation night vision & fire control system. Additionally, the weight was to be under 35tons, the max speed 80 kph, and the maximum road range to be 500 Km using only internal fuel.

That year, the project was offered to German and French enterprises to help a inexpert argentinian engineers. The Argentinian Army also evaluated two options: the german Leopard 1 and the french AMX-30. The vehicle selected was to be produced in Argentina. The USA also sent a M60A1 for evaluations, but the vehicle was stored because of its high weight and slow speed. Thyssen Henschel present a version of Marder 1 AIFV, which could be produced in two versions: TAM VC with a turret armed with a L-7 105 mm cannon produced under licence from the Germans, late produced in Argentina, and the VCTP, the AIFV version of TAM.

The first four prototypes, two VC and two VCTP, were delivered by Thyssen Henshel in 1976 and were evaluated by argentinian army personnel. Both models were tested under all conditons and terrains available in Argentina, the hot ecuatorial jungles to the North, the high dry deserts of the Northwest, the high mountains of the West and Northwest (6.000 meters over sea level), the plains of the Center and East, and the Mountain and antarctic desert of the South (Patagonia). The tests were succesful and later that year the Frabrica Militares de Río Tercero began producing the first batch of six pre-production vehicles.

In 1978 the TAMSE (Lit; Tanque Argentino Mediano Sociedad del Estado) factory was finished and production of TAM series vehicles: 252 TAM VC and 316 TAM VCTP was started.

In the early 1980's, TAMSE started the development of a mortar carrier of VCTP; the VCTM. It was an entirely argentinian project and 54 vehicles were requested by the Army. By that time, at least 70% of the TAM components were nationally produced.

In the mid 1980's TAMSE produced two new versions of TAM, the MRLS TAM VCLC and the recovery TAM VCRT. The ambulance TAM VCA was abandoned because of the high cost and the cheap options (M-9 Halftrack and M-113) were used instead. The VCLC was developed with israeli assistance and fitted with LAR-160 rocket launcher system. The VCLC fired the CAL 160 rocket (Cohete de Artillería Ligero de 160 mm) and the CAM-350 (Cohete de Artillería Mediano de 350 mm), both local versions of israelís LAR-160 and MAR-350 rocket. The CAL-160 used two 18 rocket containers, and the CAM-350 used four single rocket container.

The VCRT is the tank recovery version of the TAM. The prototype was produced in Argentina, but did not have a good development and was abandoned.

The VCPC command post vehicle was developed and consisted of a basic VCTP chassis without the turret and the rear MG turret, the internal configuration was redesigned, with extra radios, a map board, tactical table, and other specific equipment. This vehicle were accepted into service but only a few were produced.

Late in the 1980's, the Army needed to replace the old AMX-13 Mk. F-3 155 mm artillery vehicles, and TAMSE began to develop an SP version of the TAM. The final option was the italian Palmaria turret and 25 were bought from OTO Breda in Italy. The new TAM VCA Palmaria used a new chassis of 40tons, derived from the TAP project (Tanque Argentino Pesado), which never saw the green light. With seven road wheels and a extensive modifications, the new vehicle was evaluated in early 1990's. The production of these version was undertaken by ASTARSA shipyards from 1998-2000, because TAMSE had closed.

By 1990, Argentinian Army only had 216 TAM VC, 60 TAM VCTP, 36 VCTM and 9 VCPC, when the goverment of Carlos Menem president closed the TAM production facility. In 1994 the Army needed replace their obsolete upgraded Sherman and the goverment authorised the finishing of 46 TAM VC and 40 VCTP in storage in TAMSE. This vehicles were delivered from 1994-1996.

In 2000, the Army asked for two new versions, the VCA Palmaria support vehicle and the Command and Fire Control version. A lot of unfinished TAM VCTP chassis were stored in former TAMSE, now Centro de Recuperación de Vehicular (Lit; Recovery Vehicles Center), and the development was of the VCCDT & VCTM ammunition resupply vehicle was started.

In 2001 the Army started a study to modify the VCRT recovery prototype, this program included a change from the recovery to armoured assault engineers missions, but the political and economical problems again forced a cancellation of this project.

Other projects never seriously developed were the TAM VCLP (Lit; Vehículo de Combate Lanza Puentes or Bridge Launcher Combat Vehicle), VCDA (Lit; VC de Defensa Aerea, or Air Defense CV) with a new turret with twin 30 or 35mm cannons, and the VCLM (Lit; VC Lanza Misiles, or Missile Launcher CV) with Roland 2 or Halcón SAM (Hawk, argentinian local version of Roland 2).

A few years ago, the Argentinian Army tested ERA for the TAM VC, the ERA was of russian and israeli origin, but never entered service due to logistical problems from both suppliers (Russia and Israel).

Sideplates were developed for the TAM and all TAM family are preparated for the installation of them.

In the export market, the TAM were evaluated for:


Specifications:
Property Value
Crew
4
Ground clearance (mm)
450
Length (mm)
8230
Width (mm)
3120
Height (mm)
2420
Main weapon caliber (mm)
105
Auxiliary gun calibre (mm)
7.62
Traverse arc (degree)
360
Ammunition of the main gun
50
Ammunition of the auxiliary gun
6000
Engine power output (h.p.)
720
Max. road speed (km/h)
75
Max. road range (km)
550
Vertical obstacle (mm)
900
Weight (kg)
30000
Depth of fording, without preparation (mm)
1400
Fording depth (mm)
4000
Ground pressure (kg/sm2)
0.788
Track (mm)
2620
Fuel capacity (l)
640
Trench (mm)
2500
Gradient (%)
60
Side slope (%)
30
Number of smoke grenade launchers
8
Traverse arc (degree)
360
Elevation (degree)
18
Depression (degree)
-7


Has folowing part:
Total Amount
HSWL 204 (Transmission)
1
L7 (Gun)
1
MB 833 Ka M-500 (Diesel engine)
1

TAM quantities:
Country Qnt
ARGENTINA ARGENTINA
230
Qnt:
230

Last Contracts:
Qnt Customer Value Add Date
(Close Date)
Unit cost
230
ARGENTINA
$70.000.000
Feb 2006
(Dec 2015)
$304,348
Average Unit Cost:
$304,348

All contracts...


Related Articles

ARMATA MBT - problems 2020 (24.12.2020)

Oshkosh Defense Receives $407.3 Million Order for Joint Light Tactical Vehicles (24.02.2020)

FLIR Wins U.S. Army Heavyweight Robot Contract Worth Up to $109M (06.12.2019)

Problems of Russian Vacuum APFSDS-T projectile (25.01.2019)

U.S. Army Awards AM General $51.3 Million Contract For High Mobility Multipurpose Wheeled Vehicles (07.10.2018)

HDT Global Hunter WOLF Awarded Phase II SMET Contract (10.01.2018)

Tata Motors signs MOU with Indonesia’s PT Pindad (20.11.2016)

AT Communication is pleased to announce the expansion of its Tactical range of transceivers with the launch of the Sentry-H™ High Frequency (HF) SDR radio (22.09.2016)

AM General awarded $356 million contract to build 1,673 hmmwvs (12.08.2016)

WFEL extends US Army contract with £30m upgrade deal (21.07.2016)

Polaris Defense Unveils Turbo Diesel MRZR (19.05.2016)

AT Communication is pleased to announce the launch of the AT USB-Logger for Voice and Data (27.10.2015)

GD UK awarded GBP 3.5 Bn to deliver 589 SCOUT SV platforms to the British Army (04.09.2014)

BAE Completes 2,000 Miles of Hybrid GCV Mobility Testing Ahead of Schedule (27.08.2013)

Bushmaster - 1000 strong and still going (13.06.2013)

   
TAM
TAM
TAM
TAM
TAM
TAM
TAM
TAM