Bundeswehr to get more high-protection Fuchs/Fox 1A8 transport vehicles from Rheinmetall...>> AT LR Ground Surveillance Radar...>> US Army Ground Combat Systems adopts Sandia tool for choosing future warfighting vehicles...>> Assegai ...>> iRobot Wins $7.2 M Tender from Brazil to Provide Defense & Security Robots...>>
Army Guide - GCV Must Be Safe, Affordable, Full-Spectrum Capable
Home: :Products: :Companies: :Countries: :Contact
Russian
Nickname:
Register
Password:
Remind
 
Home
About project
AGM magazine

products
companies
countries
quantities
museum
contracts

Defence Industry
Army
Future Technologies
Contracts
Training And Simulators
Robots
Exhibitions
Term of the day

Feedback and Forum
Contact

free
paid

To Webmasters
RSS Feeds

Articles >>

GCV Must Be Safe, Affordable, Full-Spectrum Capable

Category: Army

GCV Must Be Safe, Affordable, Full-Spectrum Capable

GCV Must Be Safe, Affordable, Full-Spectrum Capable

Washington -- The Army's next combat vehicle must perform through the full spectrum of Army operations, be designed to protect itself and the Soldier, and be built with a budget in mind.

Nearly 300 attendees gathered at an industry day Oct. 1 in Detroit to discuss the acquisition strategy for the Army's Ground Combat Vehicle. During that time, Army officials explained their vision of the GCV program and gave industry insight into what they can expect with the release of the request for proposal that will kick off the development of the new vehicle.

After the Manned Ground Vehicle component was cut from the Army's Future Combat Systems program in June 2009, the Army moved quickly to develop a new vehicle -- the Ground Combat Vehicle. The program released an RFP -- an invitation to industry to come forward with offers to develop the vehicle -- in February 2010. But that RFP was ultimately cancelled in August.

Army officials said they expected a new RFP would be released within 60 days of the August cancellation -- that places the release of the new RFP in November. Program managers say they expect that release date is still doable.

"We're still aiming for that," said Col. Andrew DiMarco, project manager for the GCV, during a telephone conference with media following the industry day. "But the caveat for that is -- what I don't want to do is to put something out on the street that isn't quite right."

While the GCV program is expected to eventually produce multiple vehicles with varying capabilities, the focus for the first block of GCV development is an infantry combat vehicle, said DiMarco.

"With the incremental approach to GCV capability, our increment or block, if you will, is focused on the infantry fighting vehicle," he said. "There may be other variants that are identified from a requirements perspective, and there may be other capabilities that emerge over time... our focus right now is on one GCV, and that is the infantry fighting vehicle."

Michael N. Smith, director of the Army Maneuver Center of Excellence, said the Army emphasized the importance of the infantry fighting vehicle to potential GCV contractors during the industry day.

"The requirement is that we need an infantry fighting vehicle that can deliver a squad to the battlefield, in an improvised-explosive-device environment -- realistically in an environment of anywhere along the continuum of operations under Army," Smith said.

Smith also said the Army already has "solutions" that can operate in an IED environment, but that those cannot operate across the full spectrum of operations the Army may be called on to operate in.

"So GCV ... as a platform, is designed to allow us to address ... that spectrum of operations, spectrum of conflict, while moving that squad to where it needs to be," Smith said.

He went on to say that Army leadership developed four imperatives for the GCV, and emphasized those to industry representatives. Those include capacity, force protection, full-spectrum operations and timing. Four imperatives, he said, which are "non-negotiables" with regard to GCV development.

Capacity, he said, means "a requirement to deliver the entire infantry squad on a single platform." The force-protection requirement is separate from vehicle survivability, he said, but rather is about ensuring safety for Soldiers.

"It's a force-protection requirement that links to ensuring that the infantry squad is in fact delivered and is not taken out because the vehicle does not have the requisite protection to ensure the squad members and the crew of the vehicle are able to accomplish their mission," Smith said.

"Full-spectrum operations" means the vehicle must be able to perform missions that include both offensive and defensive operations, as well as stability operations.

"From an operational perspective, (that) means I have to have modular and scalable capabilities," he said. Smith added that the vehicle must include "a whole suite of things to allow me to adapt the platform to accomplish the mission in a wide variety of environments and terrain sets."

Timing, Smith said, means ensuring the vehicle is developed in time to ensure the end product is still valid for the mission.

"If we take too long to develop something, then by the time we have the optimized solution, the environment has changed so significantly that that solution is no longer useful," he said.

Cost is another significant element in GCV development and will play a key role in the RFP when it is released.

"Our intent for this RFP is to give them a target range and to use that as part of assessing their proposals and making a determination -- among other factors, certainly -- who ultimately will be selected," DiMarco said.

The colonel said a specific price range for manufacture would be specified in the RFP, though he was unable to say what that range would be.

DiMarco also said the RFP would focus more on vehicle performance, rather than technology, allowing industry more flexibility to develop their own solutions for meeting the Army's needs. But to help with that, he said, the Army will again make available to industry research that was done in development of the MGV, formally part of FCS.

"We provided industry with access to I think what we called the 'MGV body of knowledge,'" he said. "That was a compilation of information about things that we did under the FCS MGV program. I believe it's still our intent to provide that body of knowledge to industry again."

US Army
06.10.2010

Actions...
 
Printable Version
 
Printable Version  
rss
 
favorite
 

Discuss


At present you cannot leave messages. To be able to do this, you should enter by using your name. If you are not registetred, do it now. The registration procedure will take just one minute.
Register

US Army Ground Combat Systems adopts Sandia tool for choosing future warfighting vehicles
21.05.2013

DARPA Seeks Technology to Radically Improve Dismounted Squad Situational Awareness, Communication Effectiveness
16.05.2013

BAE Recovery Vehicles to Receive Upgrades
25.04.2013

Krauss-Maffei Wegmann Supports Qatar’s Army Modernization
18.04.2013

US Army Tank-automative & Armaments Command (TACOM)

Army

Australian Army

British Army

New Zealand Army

Philippine Army

Republic of Korea Army

Royal Thai Army

Singapore Army

Sri Lanka Army

U.S. Army

U.S. Army Materiel Command

1st Army Maintenance Center Command

U.S. Army Simulation, Trading and Simulation Command

International Defence Training (Army)

Royal Netherlands Army

THE ASSOCIATION OF THE U.S. ARMY - AUSA

Czech Army Foreign Relations Office

Army Security Assistance Command - USASAC

U.S. Army Armament Research, Development and Engineering Center (ARDEC)

Army Magazine

Center for Army Conversion and Disarmament Studies (CACDS)

Direccion de Investigacion Desarrollo ó Produccion of the Army

EXCALIBUR ARMY spol. s r.o.




Latest Forum Posts
Die Bezeichnung des Tages...
Posts - 61
Kenner (15:10 15.04.2013)
中文 - méi tiān xu...
Posts - 49
大面 (10:26 29.03.2013)
Le terme du jour...
Posts - 53
cognitio (10:12 22.03.2013)
Termin dnia...
Posts - 47
pułkownik (10:40 05.03.2013)
Termo do dia...
Posts - 55
arco-íris (17:03 22.02.2013)
Forums List


Last Article Posts
Navistar Defense Begins Producing MaxxPro Dash; To Reach Full Production by Mid-October... (06.09.2012)
Posts - 1
BAE Systems Introduces New Gun Shield to Ease Transport of Vehicles... (09.03.2012)
Posts - 1
Ukrainian Army to Purchase New Oplot MBTs... (03.08.2011)
Posts - 2
Main Battle Tank... (20.07.2011)
Posts - 14
New MBT122B Evolution with Unprecedented Protection... (23.12.2010)
Posts - 2


Most Popular Articles
Main Battle Tank... (21.07.2006)
Visits - 111576
Principles of Design of the Fighting Vehicle Crew Training Aids... (11.01.2005)
Visits - 50167
Ukrainian Army to Purchase New Oplot MBTs... (07.10.2008)
Visits - 38168
Patria Received an Order for Patria Nemo Concept Study from the Finnish Navy... (14.06.2007)
Visits - 27732
New MBT122B Evolution with Unprecedented Protection... (21.12.2010)
Visits - 20812
All Articles


Home | Articles | Products | Companies | Countries | Quantities | Denial of Guarantees and Rights | Contact | Russian

© ATEN, 2002-2008